IDOT announced Monday that lanes in work zones will be reopened where possible for the July 4 holiday to minimize travel disruption.

Non-emergency roadwork will be suspended from 3 Tuesday afternoon until  11:59 p.m. Wednesday night when construction will be permitted to resume.

The following lane closures will remain in place. Work zone speed limits will remain in effect where posted.

Jackson County
• Illinois 13 west of Carbondale; lane reductions continue.

Perry County
• Illinois 154 east of U.S. 51; lane reductions continue, controlled by signals.
• Illinois 13/127 south of Illinois 152; lane reductions continue, controlled by signals.

Union County
• Interstate 57 at the Anna interchange; lane reductions continue.

White County
• U.S. 45 south of Illinois 14; lane reductions continue, controlled by signals.

Williamson County
• Illinois 37 south of Marion; lane reductions continue, controlled by signals.